  • Adelaide Entertainment Centre - Food & Beverage Upgrade, SA

    Client: Adelaide Entertainment Centre

    Location: Adelaide, South Australia

    Value: $2m

    Delivery System: Construction Management

    Contract Time: 20 weeks

    Completion Date: February 2010 

    In late 2009 Hansen Yuncken, Building Solutions undertook a progressive replacement of the food & beverage outlets within the Adelaide Entertainment Centre. This was done during the later stages of Hansen Yuncken’s major expansion works for the Adelaide Entertainment Centre.

    The existing bars & food outlets were demolished and rebuilt in stages, allowing the venue to continue concerts and product sales during the work. Throughout the project several cost saving measures were initiated by the site team and design details were finalised direct with the Adelaide Entertainment Centre.

    The work involved a full range of commercial catering equipment and was spread over several compact areas of the venue. Construction was successfully completed within the agreed budget and program prior to the whole redevelopment opening in March 2010.

  • Heidelberg Repatriation Hospital - 24 bed sub-acute ward, VIC

    Client: Austin Health

    Location: Heidelberg, Victoria

    Value: $1m

    Delivery System: Lump Sum

    Contract Time: 3 months

    Completion Date: July 2009 

    This project consists of refurbishment and fitout of the existing Sub-acute ward, carried out within an operating hospital facility. The project was completed within 3 months, and despite the project scope increasing by 15%, the project duration increased by only 1 week. Extensive redesign of services was devised by our project team which saved additional rework to ceilings, providing savings to the client.

  • EPA Accommodation Project, VIC

    Client: Department of Treasury & Finance

    Location: Melbourne, Victoria

    Value: $8.5m

    Delivery System: Lump Sum

    Contract Time: 4 months

    Completion Date: October 2009 

    This 6 Green Star rated 4 level fitout was won by lump sum for tender in mid 2009. The fitout houses the new Victoria headquarters for the EPA, and environmentally sensitive design and construction techniques were used throughout. 

    The works commenced concurrently with the base building works which were being completed on this 1960’s era building. The fitout comprised a new staircase servicing all floors, extensive structural strengthening works, new services to floors and high level joinery and finishes. This challenging job was completed within the client’s strict timeframe and to their complete satisfaction.
     
    Awards:
    Master Builders Association of Victoria Excellence in Shop and Office Fitout
    Australian Institute of Building (Victorian Chapter) - Professional Excellence Award - Commercial Construction $1m to $10m
  • Kangan Batman TAFE - Early Works, VIC

    Client: Kangan Batman TAFE

    Location: Docklands, Victoria

    Value: $0.5m

    Delivery System: Lump Sum

    Contract Time: 2 months

    Completion Date: January 2009 

    Various internal and external modifications to existing Automotive Centre of Excellence building, including provision of new gas bottle storage and gas reticulation, creation of new roller door entrance and other internal changes. Completed over Christmas teaching shut down period to avoid any loss of teaching time.

  • University of Melbourne - Old Metallurgy Building Refurbishment, VIC

    Client: University of Melbourne

    Location: Parkville, Victoria

    Value: $1.1m

    Delivery System: Lump Sum

    Contract Time: 3 months

    Completion Date: May 2008 

    Refurbishment of Old Metallurgy Building at the University of Melbourne’s Parkville campus to house new laboratories and offices for students and staff. Completed to a very tight programme and incorporated many design initiatives to provide cost savings for the client’s budget.

  • National Measurement Institute, VIC

    Client: Department of Innovation, Industry, Science and Research

    Location: Port Melbourne, Victoria

    Value: $6.8m

    Delivery System: Construction Management

    Contract Time: 5 months

    Completion Date: July 2008

     

    2,000m2 of new laboratories with 20 fume cupboards were constructed along with 1,000m2 of new office space, with all new services and new lift. Each laboratory has its own airconditioning system to reduce cross contamination and provide independent control.  Two of the laboratories are provided with HEPA filtration to maintain cleanliness. A separate make up air system is provided for the fume cupboards independent of the Laboratory airconditioning  systems.  All systems are controlled by the site BMS including monitoring of the power consumption for the site.

     

     
    Leasing restrictions demanded an extremely tight programme which necessitated extensive use of night works and other out of hours works. The on site construction period was an extremely rapid 4 months. A high degree of collaboration with the client and the design team enabled this deadline to be successfully met.
     
    The success of this project was recognised with the awarding of a High Commendation at the National Australian Institute of Building Awards.

     

    This project involved the fitout of internal warehouse and mezzanine office space to create new headquarters for National Measurement Institute.
  • National Measurement Institute - Stage 2, VIC

    Client: Department of Innovation, Industry, Science and Research

    Location: Port Melbourne, Victoria

    Value: $2m

    Delivery System: Negotiated

    Contract Time: 3 months

    Completion Date: July 2009 

    This PC2 laboratory fitout project followed on from the success of the initial award winning National Measurement Institute project completed in mid 2008.

    These labs required a temperature tolerance of ±0.3°C in their main Lab and ±0.1°C in their Precision Lab.  To achieve these tight tolerances the airconditioning systems have been designed with very high air change rates of up to 150 air changes per hour.  To assist in the delivery of air into each lab lamina flow Luwa ceiling panels have been installed to reduce the air mixing.  Return air is taken at low level.  An intermediate ceiling level is provided  which contains the light fittings and supply air outlets.  Air is exhausted through the light fittings to minimise the amount of heat from the lights entering the Labs.  The systems are controlled by the site BMS.

    The laboratory is now being used by the government department for the testing and measurement of surfaces, foods and materials for consumer protection and information.

  • RMIT Building 56 and 57 Fitout, VIC

    Client: RMIT University

    Location: Carlton, Victoria

    Value: $3m

    Delivery System: Lump Sum

    Contract Time: 6 months

    Completion Date: July 2010

    Refurbishment and fitout of two levels at RMIT’s Building 56 & 57, with multiple staging and working adjacent to ongoing teaching operations. This project comprises classrooms, theatres, offices and back of house facilities.

  • State Coronial Service Centre - Early Works, VIC

    Client: Department of Justice

    Location: Southbank, Victoria

    Value: $0.95m

    Delivery System: Lump Sum

    Contract Time: 3 months

    Completion Date: February 2009

    Construction of new office facilities for State Coronial Services Centre in Southbank, allowing for major new works to the centre. Project included civil works, construction of portable office buildings, extensive internal office modifications and new covered walkways.

  • US Consulate - Hardline Wall Extension, VIC

    Client: US Consulate

    Location: Melbourne, Victoria

    Value: $940k

    Delivery System: Lump Sum

    Contract Time: 5 months

    Completion Date: August 2010

     

     

    This project involves works to the eastern end of the sixth floor of the US Consulate (Melbourne) to provide a ‘hardline barrier’ along the perimeter corridor and the rear of some work areas.
     
    The work involves the demolition of existing walls to enable 15 minute Forced Entry & Bullet Resistant (FEBR) and 5minute Forced Entry (FE) barriers (ie: walls & doors) to be installed.
     

    All works are being completed whilst adjacent areas are still occupied and operational.

  • Victoria University - Hospitality Facilities, VIC

    Client: Victoria University

    Location: Footcray, Victoria

    Value: $3.8m

    Delivery System: Lump Sum

    Contract Time: 6 months

    Completion Date: August 2010

    This project comprises a small extension and internal fitout at the Footscray campus, comprising restaurant, kitchens and classrooms for Victoria University’s hospitality training school.

  • Waterfront City - Retail Tenancy Fitouts, VIC

    Client: ING Real Estate Developments

    Location: Docklands, Victoria

    Value: $7m

    Delivery System: Construction Management

    Contract Time: 4 months

    Completion Date: November 2008

    Works were completed in close coordination with the client with the Building Solutions team responding to fast moving design specifications.

    Fitout of 25 retail tenancies in the Docklands Waterfront City project.

    These included the complete fitout of Designer House, Fresh Food Market and Garrads stores.

  • Waterfront City - Designer House Fitout, VIC

    Client: ING Real Estate Developments

    Location: Docklands, Victoria

    Value: $3.5m

    Delivery System: Construction Management

    Contract Time: 2.5 months

    Completion Date: October 2008

     

    The fitout of ‘Designer House’, a specialty fashion and designer retail store, was completed for ING Real Estate in late 2008. This store is the fashion showpiece of the Waterfront City retail precinct at Docklands.
     
    This fitout incorporated high level finishes throughout, including polished plaster, ‘Extenzo’ stretched polymer ceiling and designer light fittings.
     

    The $3.5 million and 1700m2 of fitout works was completed in a very rapid 2 ½ months, necessitating extensive out of hours works. All works were completed to a very high level of quality and the result is a stunning showpiece of the fitout capability of our teams.

  • Blueline Laundry Extension, TAS

    Client: Blueline Laundry

    Location: Newtown, Tasmania

    Value: $0.56m

    Delivery System: Tendered

    Contract Time: 5 months

    Completion Date: March 2010

    The extension to the laundry was to improve the distribution and sorting areas with the addition of 270m2 of floor space. The floor was half suspended and half on the ground with concrete panels forming the walls. Structural steel for the roof frame, and aluminium windows with louvers to provide ventilation.

  • Blueline Laundry Chemical Store, TAS

    Client: Blueline Laundry

    Location: Newtown, Tasmania

    Value: $51k

    Delivery System: Tendered

    Contract Time: 2 months

    Completion Date: May 2009

    The chemical store was needed due to the expansion of the laundry operations and to give better access for the delivery of the chemicals to site. We were awarded the works to the chemical store because of the clients satisfaction from the main laundry extension.

  • Royal Hobart Hospital Kitchen Refurbishment, TAS

    Client: Department of Health &  Human Services

    Location: Hobart, Tasmania

    Value: $580k

    Delivery System: Cost Plus

    Contract Time: Ongoing, started Apr 10

    Completion Date: Ongoing

    The installation of 20 new B-Pod units for cooking meant altering the location of Bondor walls, the installation of Air conditioning units and new mechanical switchboards. We have now moved on to installing a trolley wash room to an old elevator shaft with all new drainage and a Karcher high pressure cleaning unit.

  • Dick Smith, TAS

    Client: Silverleaf Investments

    Location: Hobart, Tasmania

    Value: $1.4m

    Delivery System: Cost Plus

    Contract Time: 9 months

    Completion Date: August 2009

    The client asked HY to refurbish part of the old Harris Scarfe building to accommodate the new Dick Smith Store with a total floor area of 830m2. We worked in with the Dick Smith consultants to achieve the required results on time and with 1 defect at the end of the project.

  • Reject Shop, TAS

    Client: Silverleaf Investments

    Location: Hobart, Tasmania

    Value: $1.25m

    Delivery System: Cost Plus

    Contract Time: 8 months

    Completion Date: August 2009

    The client asked HY to provide a new floor area to the old Harris Scarfe Cafe of 650m2 on one level. This required the demolition of all existing concrete floors for a fresh start but involved the removal of 300 cubic metres of rubble up one floor to street level all done after hours. Once all rubble was out we placed new foundations for the future works for Dick Smith above and installed the new floor, ventilation system and all electrical requirements for the proposed tenants.