City West Campus, University of South Australia
22 November, 2023The City West Campus on Adelaide’s North Terrace was constructed in 20 months and benefitted from Hansen Yuncken’s pioneering spirit.
Off site prefabrication of façade panels and prefabricated steel mall canopies, paired with carefully considered crane placement allowed for efficient materials handling among a busy CBD location.
The project involved construction of eight new buildings, constructed independently along its own critical path network. Creating links between critical paths reduced site activity time and created cost savings without compromising quality.