Her Majesty’s Theatre Redevelopment
This modern transformation celebrates the success of construction and engineering challenges while respecting the much loved heritage of Her Majesty’s Theatre. Using a detailed engineering methodology, Hansen Yuncken designed and installed a façade bracing system to protect and stabilise the heritage façade and eastern wall.
1,467 Seat Auditorium
Significant Heritage Restoration
Adelaide’s Oldest Continually Operating Performance Venue
FSC Rated Timber for Low Environmental Impact
Behind the façade, an intricate demolition process was used to clear the way for a brand new, state of the art theatre. A complex ‘birdcage’ scaffolding structure was carefully installed inside the building to enable delicate heritage works around complex interiors. This landmark redevelopment has now increased seating capacity from 970 to nearly 1,500 in the 3-level auditorium, allowing an additional 50 performances each year – enriching the arts and renewing life to this magnificent theatre.
A notorious signature wall, covered with the names and messages of some of the stages’ biggest stars, was deconstructed and reconstructed by hand – brick by brick
Featuring custom joinery throughout, the stunning internal finishes of the project demonstrate an exceptional level of quality and detail. The Timber selection was Forest Stewardship Council (FSC) rated for low environmental impact. Design decisions were carefully considered for longevity and waste reduction in pursuit of a healthy working environment for this reinvigorated artistic space.