Brenan Place

  • Client
    IFM Investors
  • Location
    Fitzroy, Victoria
  • Status
    Complete
  • Value
    $101 million
  • Delivery Method
    DC
Brenan Place

Situated within Melbourne’s renowned St Vincent’s Hospital precinct in Fitzroy, Brenan Place is a landmark 14-storey medical office development that strengthens the campus’ position as a leading hub for healthcare, education and life sciences innovation.

Designed to support the precinct’s clinical, research, teaching and administrative functions, the PCA A-Grade building delivers premium accommodation for healthcare, life sciences, education and commercial tenants within a highly connected environment. Complementing the workplace offering are retail spaces and premium end-of-trip facilities, creating a vibrant and state of the art destination for occupants and visitors alike.

Demonstrating a strong commitment to sustainability, Brenan Place has achieved a 5 Star Green Star rating, a 5.5 Star NABERS Energy rating and a 3 Star NABERS Water rating.

A defining feature of the development is the restoration and integration of the heritage-listed Brenan Hall. Originally constructed in 1889 as the Hall of Science, the restored building has been transformed into a sophisticated business lounge and event space within the main lobby, seamlessly blending the site’s rich history with a contemporary vision for the future.

Hansen Yuncken’s involvement extended beyond the delivery of the base building to include integrated fitout works for key precinct stakeholders, including St Vincent’s Hospital and Australian Catholic University, providing high-quality, purpose-built environments that support the diverse needs of the campus community.

17,316m² health and commercial development

Significant value management savings achieved

Additional 275m² of net lettable area unlocked

Defining heritage-listed features

Delivered on an exceptionally constrained brownfield site alongside the operational St Vincent’s Hospital, Brenan Place demanded meticulous planning, stakeholder coordination and early collaboration. Working closely with St Vincent’s from the outset, the team priced, designed and integrated the fitout with the base build to ensure spaces were operational from day one, while early mechanical design engagement mitigated equipment lead-time risks.

Construction interfaces extended across hospital patients and staff, pedestrians, public roads, neighbouring construction activity and the adjacent ACMD development, requiring complex traffic management, detailed interface methodologies and carefully staged works to maintain safe, uninterrupted access throughout delivery.

A Heritage Landmark at the Heart of a Contemporary Precinct, Connecting Health, Research and Commercial Opportunity While Maximising Value from Every Square Metre

A defining feature of Brenan Place is the integration of the heritage-listed Brenan Hall, originally constructed in 1889 as the Hall of Science. Rather than standing apart from the new development, the historic building has been sensitively incorporated into the contemporary precinct, with its façade partially reconstructed and refinished and heritage elements including the foundation stone and gates reinstated.

Specialist heritage contractors and engineers worked closely with the project team to carefully tie together multiple skins of existing brickwork, overcoming limited original engineering information to achieve a seamless presentation between old and new.

Accepted file types: pdf, doc, docx, txt, rtf, Max. file size: 6 MB.
Accepted file types: pdf, doc, docx, txt, rtf, Max. file size: 6 MB.
Accepted file types: pdf, doc, docx, txt, rtf, Max. file size: 6 MB.